Separation Plant
A bituminous
sand separation plant was designed, constructed, and operated under the
immediate charge of W. G. Jewitt. The design was based on that of the small
plant successfully operated the previous year at the University. The old plant
could treat half a ton of sand per hour for short periods, while the new plant
was designed for steady operation and to treat one tonne per hour. The site
selected was the Dunvegan Yards in Edmonton.
Alberta Research Council. [1924] Annual Report. With permission from the Alberta
Research Council.
|
|